> News from 2023

2023 – Germany, DK Recycling und Roheisen GmbH & Co. KG – Wind heater

As part of the refurbishment of wind heater 4 at DK Recycling und Roheisen GmbH, TUB Technik GmbH has been commissioned to dismantle and install the following components:

  • Dismantling of the dome centre, clearing opening, manhole connection and dome sheet metal casing
  • Installation of dome central lock, hot blast connection, combustion chamber connection, stone retaining rings, stainless steel sheet lining
  • Installation of grates and dome sheet metal casing.

All work is carried out by TUB Technik GmbH in accordance with quality standards and without accidents.