2024 – Germany, SWISS KRONO TEX GmbH & Co. KG
TUB Technik GmbH was commissioned to dismantle the old scrubber. A total of 160 tonnes of steel and container structures
Read MoreTUB Technik GmbH was commissioned to dismantle the old scrubber. A total of 160 tonnes of steel and container structures
Read MoreThis year, TÜV SÜD once again conducted surveillance audits for the standards DIN EN ISO 14001:2015, DIN EN ISO 50001:2018,
Read MoreTUB Technik GmbH will be commissioned to carry out mechanical work as part of the blast furnace lining in summer
Read MoreTUB Technik GmbH is commissioned to carry out steel construction repair work on the air ducts to and from the
Read MoreTUB Technik GmbH has been commissioned to manufacture, deliver and assemble steel structures and piping for the conversion of a
Read More